PVA
The glossary

A term worth knowing

Design development

Design development is a design phase that takes an approved schematic direction and makes it more specific. The team refines layouts, materials, building systems, equipment coordination, and the relationships between architectural, structural, and building services work. The phase helps owners evaluate how the project will function and how systems fit together, while preparing for more detailed construction documents. The exact scope varies by contract, and some selections, engineering, coordination, or procurement details may still be open when the phase is considered complete.

Context

Why it matters

This is an important point to confirm that the design direction remains aligned with the owner's brief, budget assumptions, operating plans, and schedule. Resolving mismatches now may be less disruptive than discovering them after bid packages or construction are underway.

A phase label does not guarantee a particular level of detail. Owners should understand what has been coordinated, what remains provisional, and which decisions must be made before the next phase can support reliable procurement.

At the table

Questions for the owner

  • 01Have the design team documented the major systems, materials, layouts, and equipment assumptions and explained changes from the approved concept? Review them with the people responsible for future operation and maintenance.
  • 02Are architectural, structural, and MEP designs coordinated at important interfaces, or are conflicts being deferred? Ask for a list of open coordination items, their owners, and the planned resolution point.
  • 03Does the current estimate or schedule reflect the developed scope and remaining uncertainty? Confirm that assumptions, exclusions, and pending owner choices are visible before authorizing the next phase or treating the estimate as a settled basis.
Confidential fit discussionRequest a project review