PVA
The glossary

A term worth knowing

Efficiency ratio

An efficiency ratio in building planning describes the relationship between area that serves a defined usable or rentable purpose and a larger reference area, such as gross building area. The specific numerator and denominator must be stated because measurement conventions and project uses vary. It is a planning comparison, not a universal rating of design quality. Circulation, building services, structure, amenities, shared space, and code or operational needs all affect the result. A ratio should be considered alongside the functions the space must support, user experience, constructability, and operating requirements.

Context

Why it matters

Efficiency affects how much of a building's area is assigned to different uses, but maximizing a ratio without context can compromise circulation, services, amenity, or flexibility.

Clear area definitions help owners compare design options on a consistent basis and understand the consequences of changes to layout or core planning. They also help align the architectural area schedule with the assumptions used by development, leasing, and operations teams, reducing confusion when different documents report different measures.

At the table

Questions for the owner

  • 01Ask the design team to define the measured areas, drawing basis, and treatment of shared, service, amenity, and circulation space. Keep any excluded or differently classified areas visible in the comparison.
  • 02Check that proposed improvements preserve required functions, accessibility, servicing, operations, and the intended quality of the space.
  • 03Review area calculations against the current plan and confirm that any design revision has not changed the measurement convention. Keep the calculation linked to the drawing revision and area schedule used for the decision, especially when options are being compared.
Confidential fit discussionRequest a project review