PVA
The glossary

A term worth knowing

FAR

FAR, or floor area ratio, compares the floor area counted under applicable planning rules with the area of the site used for that calculation. It is a land-use measure that can help describe development intensity. The rules defining countable floor area and site area vary by jurisdiction and may include exceptions, incentives, or special measurement methods. FAR does not by itself determine the number of units, building height, usable area, or whether a proposal can be approved. Owners should confirm the applicable definitions and constraints with qualified local planning and design professionals.

Context

Why it matters

An assumed FAR can shape early yield studies and the amount of building area a team tests. A mistaken interpretation can distort feasibility before design has addressed other constraints.

The ratio must be read with setbacks, height, parking, access, infrastructure, and site conditions. A theoretical area allowance may not translate directly into a workable plan. Connecting the calculation to a test-fit helps decision makers see whether the assumed floor area can be arranged in a functional and approvable building form.

At the table

Questions for the owner

  • 01Identify the applicable zoning district and ask the planning professional to explain how site area and countable floor area are measured for the parcel.
  • 02Compare the assumed development area with plans that account for setbacks, height, access, parking, utilities, and other site constraints.
  • 03Keep the source, date, and unresolved interpretation questions with the feasibility analysis; confirm project-specific requirements with local professionals. Revisit the calculation when parcel boundaries, proposed uses, or the building concept changes, because each can affect the study's assumptions.
Confidential fit discussionRequest a project review