PVA
The glossary

A term worth knowing

Life cycle cost

Life cycle cost describes the costs associated with an asset over a defined period of ownership or use, rather than only the amount required to construct it. Depending on the analysis, it may consider acquisition, energy, staffing, maintenance, repair, replacement, and end-of-life needs. The included categories and evaluation period should be stated because different assumptions can produce different comparisons. It is a decision aid, not a promise of future expenses. Results depend on design information, operating practices, use patterns, and assumptions about future conditions, and should be interpreted alongside performance and service requirements.

Context

Why it matters

A design choice with a modest construction impact may change future maintenance access, energy demand, reliability, or replacement planning. Owners need to understand those effects before treating alternatives as interchangeable.

Making assumptions visible allows the project team and future operators to assess whether the comparison matches how the facility will actually be used and maintained. This discussion can reveal whether a decision depends on a maintenance practice, staffing plan, or replacement strategy that has not yet been assigned or confirmed.

At the table

Questions for the owner

  • 01Ask which cost categories, period, use pattern, and operating assumptions are included, and which are excluded from the comparison.
  • 02Check that alternatives provide comparable functions and service levels. A less costly option may rely on different staffing, maintenance, or replacement practices.
  • 03Have facilities and operations representatives review the assumptions and identify information that should be carried into design, procurement, and handover. Capture responsibilities for service access, maintenance documentation, training, and future replacement planning before the project moves into delivery.
Confidential fit discussionRequest a project review