A term worth knowing
Submittal
A submittal is information a contractor provides for review before incorporating a product, equipment item, fabrication, or installation method into the work. It may include product data, samples, shop drawings, or coordination details, depending on the contract requirements. The design team checks the material against specified requirements and design intent, while the contractor remains responsible for selecting and coordinating the work as assigned by the contract. Review is not necessarily a guarantee that every dimension, field condition, or contractor obligation has been verified.
Context
Why it matters
Submittals connect design intent with what will actually be ordered and installed. Delayed or incomplete review can hold up procurement, while unclear review responsibility may leave owners assuming that someone else has checked interfaces, substitutions, or fit.
A submittal process also creates a record of product choices and exceptions. Owners need to see important departures from the basis of design, particularly when they affect operations, durability, appearance, maintenance, or compatibility with other systems.
At the table
Questions for the owner
- 01Does the submittal register cover the items that require review, and does it identify the responsible reviewer and sequence? Compare the schedule with procurement needs so a review is not requested only after the item is needed on site.
- 02Are substitutions and deviations clearly identified rather than buried in product literature? Ask the design team to state whether each exception meets the contract requirements and to flag consequences for performance, appearance, warranties, or maintenance.
- 03What does the review stamp or response mean under the contract, and what remains the contractor's responsibility? Make sure the team communicates that boundary and records unresolved comments before fabrication or installation.