Why It Pays to Bring in a Second Set of Eyes Early in Development

An early review gives an owner more choices to investigate before decisions become embedded in design, contracts, procurement, and schedule.

By Ivan DuschatzkyPublished Updated 8 min read
ILLUSTRATIVEOpportunity to influence project value
Illustrative early-development opportunity curveThe room to influence project value is greatest at site selection and concept, then narrows through schematic design, design development, construction drawings, contract negotiation, and construction. This is a conceptual illustration, not measured data.SiteselectionConceptSchematicDesigndevelopmentConstructiondrawingsContractnegotiationConstruction
This curve is conceptual, not measured data. Earlier decisions generally leave more room to act before scope and commitments narrow the options.Scroll the graphic horizontally to see every stage.

Review the decision while it is still movable

Early review is useful because it changes what an owner can still do. Before a site is acquired, the owner can revisit the development thesis. Before design is fixed, the team can study alternatives. Before a bid package is issued, scope can be clarified and procurement strategy adjusted. Once documents, commitments, and field work accumulate, a change can require more coordination and may affect other decisions.

That does not mean every early idea is valuable or that a second reviewer should slow the team down. The purpose is to bring an independent owner-side perspective to consequential decisions while the project still has room to respond. A focused review asks what assumption is being made, what evidence supports it, what remains uncertain, and what action would preserve the owner’s options.

Start by defining the decision in front of you. It may be whether to pursue a site, what program it can support, whether to advance a design direction, how to structure a bid, or whether a project remains feasible after new information. Name the decision maker and the date when the team needs a recommendation. Then invite the relevant specialist to examine the question, not the entire project indiscriminately.

Why timing changes the available choices

At the start of development, the owner may still be able to test use, scale, phasing, access, parking, infrastructure assumptions, and project economics together. After those assumptions move into design and consultant work, changing one can affect many others. A later adjustment may require redesign, approvals, contract changes, procurement revisions, or schedule recovery planning.

Treat timing as a sequence of decision windows rather than a countdown. Each window has different information and choices. Before acquisition, a site feasibility review can investigate planning questions, physical constraints, infrastructure, and the development thesis. During design, review can check whether the program and technical approach still align with the owner’s goals. During procurement, attention shifts to scope completeness, bid comparability, exclusions, and timing.

The goal is not to freeze every choice as early as possible. It is to know which choices are reversible, which are becoming embedded, and what information is needed before committing. Site feasibility is one starting point when the question concerns what a property can support. Owner’s representation can help coordinate decisions and owner-side review as the work advances.

An illustrative curve of remaining room to act

The curve below is illustrative, not a project forecast or measured dataset. It describes a general relationship: as work and commitments become more established, the effort required to change direction often increases, while the number of practical alternatives may narrow. Actual projects vary, and a qualified team should assess the specific facts.

  • Early development: More strategic alternatives may still be open. Test the site, program, constraints, and assumptions before relying on a single path.
  • Design development: Alternatives can be compared against developing plans, consultant input, budget, and approval requirements. Capture decisions and dependencies.
  • Procurement: The owner can still clarify packages and compare proposals, but issued documents and market responses shape the available choices.
  • Construction: Changes must be coordinated with contracted scope, schedule, site conditions, and work already underway. Assess the full effect before directing a change.

Imagine a curve that begins with broader room to change direction and gradually narrows as decisions, agreements, and physical work accumulate. The sketch is conceptual only, not a numerical scale, savings estimate, or guarantee of results.

Direct the review toward a defined question

A useful second set of eyes needs a clear assignment. Share the current decision, key documents, relevant assumptions, constraints, and what the owner needs to decide. Ask the reviewer to distinguish facts from assumptions, flag missing information, and explain how findings affect the decision.

For a site, examine intended use, planning context, access, utilities, physical conditions, phasing, and economics. For design, check whether space, systems, circulation, parking, and constructability support the program. For procurement, trace scope through drawings, specifications, quantities, qualifications, and exclusions.

Keep the assignment practical. A short list of decision-critical issues is more useful than a large collection of observations with no owner or next step. Ask the reviewer to identify what can be resolved now, what requires specialist confirmation, and what should remain an explicit risk or open question.

Match the reviewer to the problem

“Second set of eyes” does not mean one person should be expected to know every discipline. Match the question to the needed expertise. A land or entitlement issue may require a land-use professional or local specialist. A building-system question may require an engineer. A construction pricing question may need an estimator or procurement specialist. A contract interpretation should go to qualified counsel.

The owner-side adviser frames the question, coordinates professionals, and brings findings into the decision process. The adviser should state the limits of its expertise and not present a specialist’s review as a substitute for licensed professional judgment. Ask who does the analysis, who takes responsibility for technical work, and how conflicts are disclosed.

For a defined question about project assumptions or documents, an independent construction peer review may provide a focused additional perspective.

At Project Value Advisors, the approach draws on the Construction Headhunters network. The network includes construction professionals across roles and sectors, which can help identify a relevant specialist when a project needs a targeted perspective. That reach is useful only when matched to the actual problem. The purpose is not to introduce more people for its own sake, but to find the right experience for the decision. Learn more about the team and network on the About page.

Make findings usable to the owner

Ask for findings in a format that turns analysis into action. Each item should state the observation, the document or assumption behind it, why it matters, the responsible person, and the next step. If a conclusion depends on information that is not available, say so. If the reviewer recommends an alternative, identify what needs to be checked before the owner relies on it.

Tie findings to a decision log and project baseline. Record which design version, estimate, schedule, or site information was reviewed. Keep proposed changes distinct from approved decisions. Identify who has authority to approve each action and what confirmation is needed from design professionals, contractors, counsel, agencies, or other specialists.

This discipline avoids a common failure: the team discusses a concern, but the owner cannot later tell whether it was resolved, incorporated, priced, or assigned. A concise record allows the owner to compare the original assumption with the agreed action and to follow its effect through design, procurement, and construction.

Separate an opportunity from a recommendation

An observation is not automatically an opportunity, and an opportunity is not automatically a recommendation. A reviewer may identify a possible design adjustment, a procurement question, or a planning assumption worth testing. The team must determine whether the idea is technically sound, permissible, commercially sensible, and consistent with the owner’s priorities.

For each proposed action, ask what it changes and what it could disturb. An apparent improvement may affect another system, approval, schedule dependency, operating need, or contract boundary. Have specialists evaluate those interfaces and state the conditions, trade-offs, and approvals required.

Ask what facts support a recommendation, what remains uncertain, and whether it has been compared with the current baseline. Avoid promising savings or value before scope, assumptions, and implementation responsibilities are verified.

A team example of an early project rethink

An approved team-led luxury residential case illustrates how examining interconnected assumptions can create a different path. The team’s estimates described a Miami project with entitlement for 400 units while its original parking plan could support about 340, with ownership struggling to secure financing. The team reviewed the building and parking approach and helped revise the building configuration.

The team’s estimates described a revised plan that supported all 400 entitled units, reduced foundation costs, and freed site area for parking. The team’s estimates put added value at about $15 million at the same estimated project cost, with financing becoming easier to secure. Every figure here is a team estimate from the approved case, not a result to expect from another site. The example shows why it can be useful to check whether program, parking, structure, and financing assumptions fit together before the design path is treated as fixed.

The lesson is not that a tower is inherently better than a garden-style plan, or that every parking mismatch can be resolved through redesign. Site conditions, approvals, market, and project requirements differ. The owner should use a case as a prompt for disciplined questions, then verify a potential alternative with the project’s own professionals.

Choose a review point and close the loop

Do not wait for a crisis to ask for independent review. Choose the next consequential decision and identify when the owner still has a genuine choice. Bring in the appropriate reviewer early enough to examine the facts and coordinate with the project team. Ask for findings before the relevant design, contract, or procurement decision is treated as final.

After review, assign each open item and establish how it will be closed. Confirm whether the team will revise plans, clarify a scope, seek specialist input, update the budget, or document an accepted risk. Ask the owner’s decision maker to approve the selected path and ensure the decision appears in the working project documents.

Revisit assumptions at the next meaningful decision point. Early review is not a certification that the project is sound. New information can change feasibility, scope, procurement, and schedule. A repeatable owner-side process helps the team evaluate a response.

Frequently asked questions

When should I bring in an independent reviewer?

Bring in the relevant reviewer before a consequential decision narrows options, such as pursuing a site, fixing a design direction, issuing bid documents, or accepting a major proposal. Define the decision and information needed.

Does early review guarantee lower costs?

No. Early review can help identify assumptions, alternatives, and unanswered questions while decisions may be easier to revisit. It cannot guarantee savings, value, approvals, financing, or a project outcome. Verify recommendations with the appropriate design, technical, legal, and construction professionals.

How do I know which specialist to involve?

Start with the question and identify the expertise needed to answer it. Ask an owner-side adviser to help frame and coordinate the review, then confirm the specialist’s qualifications, scope, responsibility, and any conflicts before relying on the findings.

About the author

Ivan Duschatzky

Co-Founder & Managing Partner

Leads client relationships and brings a national construction leadership network.

Meet the PVA team

Keep reading

A second set of eyes

Your next project decision deserves a closer look.

Scope and commercial terms are agreed in writing.

Request a project review
Confidential fit discussionRequest a project review