PVA
The glossary

A term worth knowing

Parametric cost model

A parametric cost model estimates project cost by applying relationships between selected project characteristics and observed cost information. Inputs may include quantities, area, capacity, use, location, or system choices, depending on the model's purpose and data. It can support early comparisons when detailed design is unavailable, but it does not replace a scope-based estimate. The model's output depends on how well its parameters reflect the project and how current and comparable its underlying information is. Owners should understand the model structure, limits, exclusions, and uncertainty before relying on its results.

Context

Why it matters

A model can make scenario testing faster, while still concealing differences in design, site conditions, specification, procurement, or market context behind a simple input.

Knowing which variables drive the result helps owners focus further investigation on assumptions that matter to the project decision. It can also reveal where a model is sensitive to an input that the team cannot yet support, making the next diligence task more concrete.

At the table

Questions for the owner

  • 01Ask for the model's input definitions, source and applicability of its underlying information, and treatment of project-specific scope. Confirm that the person applying the model understands its intended limitations.
  • 02Test whether the project fits the model's intended use and identify site, design, schedule, or procurement factors the model may not represent.
  • 03Compare the result with independent project information as it becomes available, and label preliminary outputs clearly rather than treating them as a committed price. Preserve model version and input notes so reviewers can reproduce the comparison and identify changes in its basis.
Confidential fit discussionRequest a project review