Shared savings
Shared savings is a contract mechanism under which the owner and contractor divide qualifying savings under an agreed baseline and calculation method. The agreement needs to define what costs are included, how the baseline is established, which changes or scope reductions count, and when savings are confirmed. A lower forecast or unused allowance is not necessarily a saving eligible for sharing. The clause's effect depends on the contract language and the project's final accounting.
Context
Why it matters
A well-defined mechanism can align attention around efficiency while preserving required scope and performance. A vague baseline or unclear exclusions can instead create disagreements about whether the project actually saved money.
Owners should distinguish genuine cost reduction from deferred work, reduced quality, scope omission, or amounts already assigned to another contract provision. The final calculation should be traceable to project records.
At the table
Questions for the owner
- 01What is the baseline, when is it fixed, and how are scope, design, and market changes reflected? Ensure the comparison uses a consistent scope and states who validates the underlying estimate and final cost.
- 02Which costs qualify, and how are allowances, contingency, owner-directed changes, credits, and contractor fees treated? Ask for examples using project categories before agreeing to calculation language.
- 03Does the process protect design intent, code compliance, quality, and operations while requiring transparent records? Have the project team review outcomes and counsel review contractual wording; this is general information, not legal advice.