Value analysis

Value analysis is a deliberate examination of a product, system, design, or process in relation to the function it is expected to provide. In development work, the team describes the need, studies how the current proposal satisfies it, and considers alternatives that may better balance performance, cost, schedule, and operational demands. It can be applied to a whole project or a defined package. Value analysis is related to value engineering, though the terms may be used differently by different organizations. It does not authorize a change by itself; findings are options for the owner and responsible professionals to assess.

Context

Why it matters

Owners can use the analysis to clarify whether a specification reflects a genuine project need, a preferred solution, or an inherited assumption. That distinction can reveal room for thoughtful alternatives.

A documented comparison makes tradeoffs visible to decision makers. It also helps prevent a proposed reduction from being treated as equivalent when it changes function, serviceability, or risk. Keeping a record of alternatives and reasons for selection gives the owner a useful reference as the design advances and new proposals arise.

At the table

Questions for the owner

  • 01Confirm the function under review and the criteria that define an acceptable outcome. Include operational and user requirements, not only design preferences.
  • 02Ask the team to show the basis for each alternative, including coordination, schedule, procurement, and lifecycle considerations that may affect feasibility.
  • 03Identify who can approve the recommendation and who must update drawings, specifications, contracts, or operating plans if the owner accepts it. Ask which team members reviewed the option and whether unresolved interfaces could change its feasibility.